Cecilia High School

PROJECT DESCRIPTION
The project consisted of a New Multi-Purpose Building (Building M), a Stage Addition to the existing Gymnasium (Building G) and site work. The site work included selective demolition, a new parking lot, a new exit drive, new walks and canopy and rear drive, special systems, connections to the existing systems, a new lift station, and new sub-surface and sheet drainage.

The new Multi-Purpose building and the Stage Addition were metal building structures on a slab with concrete block walls, brick veneer, metal wall panels above the masonry, and metal roofing.

  • Owner: St Martin Parish School Board
  • Architect/Engineer: Angelle Architects
  • Project Value: $1,920,000
  • Start Date: 10/19/2012
  • Completion Date: 10/09/2013